IS WORK OVER?

Automation index

How much of a Railway engineer’s job can AI already do?

A track study comes earlier. The train not derailing without signing a half-done set of points do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Firmware engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Image, the signature and the slot.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Flash, the batch and the one that bricks.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Rollback, the test and not skipping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Boot, the brick and the one that will not start.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The factory, the cadence and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Flash without bricking, and not skipping rollback.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • firmware images
  • digital signature
  • slots
  • flash
  • rollback
  • boot
  • factory batches
  • not brick

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514

Analyse my job

Jobs with similar scores

  1. 410Tunnel engineer22%
  2. 411Power engineer22%
  3. 412Geomatics engineer22%
  4. 414Forestry engineer22%
  5. 415Geotechnical engineer22%
  6. 416Welding inspector22%