IS WORK OVER?

Automation index

How much of a Rebar worker’s job can AI already do?

A cutting list and an order come earlier. Tying a slab that holds does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Rebar worker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Cutting list, diameters and steel order.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Cut, bend and tie rebar.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Slabs, columns and starter bars.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, crane and safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, kilos and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving cover too short.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Cutting list, diameters and steel order
  • Cut, bend and tie rebar
  • Slabs, columns and starter bars
  • Site, crane and safety
  • Logs, kilos and extras
  • Not leaving cover too short
  • ferrallista
  • armador de hierro
  • rebar

Sources for this job· O*NET 47-2171.00· ESCO/ISCO 7214

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 697Forklift operator17%
  2. 698Air traffic controller17%
  3. 699Glazier17%
  4. 701Makeup artist17%
  5. 702Sailor17%
  6. 703Massage therapist17%