IS WORK OVER?

Automation index

How much of a Rebar worker’s job can AI already do?

A cutting list and an order come earlier. Tying a slab that holds does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Rebar worker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Cutting list, diameters and steel order.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Cut, bend and tie rebar.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Slabs, columns and starter bars.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, crane and safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, kilos and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving cover too short.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Cutting list, diameters and steel order
  • Cut, bend and tie rebar
  • Slabs, columns and starter bars
  • Site, crane and safety
  • Logs, kilos and extras
  • Not leaving cover too short
  • ferrallista
  • armador de hierro
  • rebar

Sources for this job· O*NET 47-2171.00· ESCO/ISCO 7214

Secondary teacher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Unit, criteria and the exam.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Classroom, the group and the one who blows it up.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Cover, the corridor and the fight.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Family, the report and not giving a 5 for quiet.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Staff, inspection and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they work, and nobody left out.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • unit plans
  • assessment criteria
  • secondary cover
  • corridors
  • the report
  • staff meeting
  • schools inspection
  • behaviour

Sources for this job· O*NET 25-2031.00· ESCO/ISCO 2330

Analyse my job

Jobs with similar scores

  1. 637Forklift operator17%
  2. 638Air traffic controller17%
  3. 639Glazier17%
  4. 641Makeup artist17%
  5. 642Sailor17%
  6. 643Massage therapist17%