IS WORK OVER?

Automation index

How much of a Rebar worker’s job can AI already do?

A cutting list and an order come earlier. Tying a slab that holds does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Rebar worker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Cutting list, diameters and steel order.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Cut, bend and tie rebar.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Slabs, columns and starter bars.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, crane and safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, kilos and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving cover too short.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Cutting list, diameters and steel order
  • Cut, bend and tie rebar
  • Slabs, columns and starter bars
  • Site, crane and safety
  • Logs, kilos and extras
  • Not leaving cover too short
  • ferrallista
  • armador de hierro
  • rebar

Sources for this job· O*NET 47-2171.00· ESCO/ISCO 7214

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 707Forklift operator17%
  2. 708Air traffic controller17%
  3. 709Glazier17%
  4. 711Makeup artist17%
  5. 712Sailor17%
  6. 713Massage therapist17%