Automation index
How much of a Recycling-plant operator’s job can AI already do?
An optical sorter comes earlier. Actually sorting without mixing the bale do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Recycling-plant operator
19%
AI can already do 19% of this job.
#532 / 643
View rankingRecycling-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Line, optical and the bale.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Cabin, the one that sneaks in and the glass.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Jam, the belt and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, the reject and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the lorry and not mixing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Sort for real, and a clean bale.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- recycling line
- bales
- sort cabin
- belts
- rejects
- glass
- optical sorters
- jams
Sources for this job· O*NET 51-9199.00· ESCO/ISCO 3132
IS WORK OVER?
Cloud architect
28%
#82 / 643
View rankingCloud architect
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagrams, ADRs and a first IaC pass.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Cost estimate, Well-Architected and gaps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Review PRs, security and network.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 20% | +3.2 |
Align with security, finops and product.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
PoCs, real failures and vendor limits.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sign the design and own the incident.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Diagrams, ADRs and a first IaC pass
- Cost estimate, Well-Architected and gaps
- Review PRs, security and network
- Align with security, finops and product
- PoCs, real failures and vendor limits
- Sign the design and own the incident
- arquitecto cloud
Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511