IS WORK OVER?

Automation index

How much of a Recycling-plant operator’s job can AI already do?

An optical sorter comes earlier. Actually sorting without mixing the bale do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Recycling-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Line, optical and the bale.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Cabin, the one that sneaks in and the glass.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Jam, the belt and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quality, the reject and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The peak, the lorry and not mixing.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Sort for real, and a clean bale.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • recycling line
  • bales
  • sort cabin
  • belts
  • rejects
  • glass
  • optical sorters
  • jams

Sources for this job· O*NET 51-9199.00· ESCO/ISCO 3132

Commissioning engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Protocol, the loop and the punch.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, start-up and the one that is not ready.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Test, the trip and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Vendors, the one who does not come and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the deadline and not signing half done.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Start up, and not leaving the interlock jumped.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • test protocols
  • loops
  • punch list
  • start-up
  • trips
  • vendors
  • interlocks
  • not sign half done

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 618Wastewater-plant operator19%
  2. 619Concrete finisher19%
  3. 620Piling operator19%
  4. 622Organ builder19%
  5. 623Palaeontologist19%
  6. 624Yacht skipper19%