Automation index
How much of a Recycling-plant operator’s job can AI already do?
An optical sorter comes earlier. Actually sorting without mixing the bale do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Recycling-plant operator
19%
AI can already do 19% of this job.
#522 / 633
View rankingRecycling-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Line, optical and the bale.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Cabin, the one that sneaks in and the glass.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Jam, the belt and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, the reject and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the lorry and not mixing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Sort for real, and a clean bale.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- recycling line
- bales
- sort cabin
- belts
- rejects
- glass
- optical sorters
- jams
Sources for this job· O*NET 51-9199.00· ESCO/ISCO 3132
IS WORK OVER?
Electronics engineer
25%
#237 / 633
View rankingElectronics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Schematic, simulation and PCB layout.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Firmware, tests and bench.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Vendors, prototypes and certifications.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Debug EMC and field faults.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versioning and quality.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not sending a blind board to manufacture.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Schematic, simulation and PCB layout
- Firmware, tests and bench
- Vendors, prototypes and certifications
- Debug EMC and field faults
- Documentation, versioning and quality
- Not sending a blind board to manufacture
- ingeniero electronico
- electronics engineer
Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2152