IS WORK OVER?

Automation index

How much of a Recycling-plant operator’s job can AI already do?

An optical sorter comes earlier. Actually sorting without mixing the bale do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Recycling-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Line, optical and the bale.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Cabin, the one that sneaks in and the glass.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Jam, the belt and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quality, the reject and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The peak, the lorry and not mixing.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Sort for real, and a clean bale.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • recycling line
  • bales
  • sort cabin
  • belts
  • rejects
  • glass
  • optical sorters
  • jams

Sources for this job· O*NET 51-9199.00· ESCO/ISCO 3132

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 636Wastewater-plant operator19%
  2. 637Concrete finisher19%
  3. 638Piling operator19%
  4. 640Organ builder19%
  5. 641Palaeontologist19%
  6. 642Yacht skipper19%