Automation index
How much of a Recycling-plant operator’s job can AI already do?
An optical sorter comes earlier. Actually sorting without mixing the bale do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Recycling-plant operator
19%
AI can already do 19% of this job.
#532 / 643
View rankingRecycling-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Line, optical and the bale.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Cabin, the one that sneaks in and the glass.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Jam, the belt and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, the reject and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the lorry and not mixing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Sort for real, and a clean bale.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- recycling line
- bales
- sort cabin
- belts
- rejects
- glass
- optical sorters
- jams
Sources for this job· O*NET 51-9199.00· ESCO/ISCO 3132
IS WORK OVER?
Port crane operator
18%
#582 / 643
View rankingPort crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Stowage, bays and the twistlock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, the wind and the spreader.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Shift, the ship that arrives and the one that leaves.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Breakdown, the spreader that will not lock and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The docker below and covering nobody.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Not hitting the ship, and leaving the bay clear.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- stowage
- twistlocks
- spreader
- bays
- lift boxes
- quay wind
- terminal shifts
- cover nobody
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343