IS WORK OVER?

Automation index

How much of a Recycling-plant operator’s job can AI already do?

An optical sorter comes earlier. Actually sorting without mixing the bale do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Recycling-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Line, optical and the bale.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Cabin, the one that sneaks in and the glass.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Jam, the belt and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quality, the reject and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The peak, the lorry and not mixing.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Sort for real, and a clean bale.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • recycling line
  • bales
  • sort cabin
  • belts
  • rejects
  • glass
  • optical sorters
  • jams

Sources for this job· O*NET 51-9199.00· ESCO/ISCO 3132

Safety engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
HAZOP, nodes and the minute.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the scenario and the one that was not thought.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
SIL, the valve and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Incident, the lesson and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Management, the cost and not yielding the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Stop, and not signing the risk that kills.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • HAZOP
  • nodes
  • SIL
  • safety valves
  • incidents
  • interlocks
  • safety minutes
  • not jump

Sources for this job· O*NET 17-2111.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 618Wastewater-plant operator19%
  2. 619Concrete finisher19%
  3. 620Piling operator19%
  4. 622Organ builder19%
  5. 623Palaeontologist19%
  6. 624Yacht skipper19%