IS WORK OVER?

Automation index

How much of a Recycling-plant operator’s job can AI already do?

An optical sorter comes earlier. Actually sorting without mixing the bale do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Recycling-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Line, optical and the bale.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Cabin, the one that sneaks in and the glass.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Jam, the belt and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quality, the reject and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The peak, the lorry and not mixing.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Sort for real, and a clean bale.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • recycling line
  • bales
  • sort cabin
  • belts
  • rejects
  • glass
  • optical sorters
  • jams

Sources for this job· O*NET 51-9199.00· ESCO/ISCO 3132

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 626Wastewater-plant operator19%
  2. 627Concrete finisher19%
  3. 628Piling operator19%
  4. 630Organ builder19%
  5. 631Palaeontologist19%
  6. 632Yacht skipper19%