IS WORK OVER?

Automation index

How much of a Reliability engineer’s job can AI already do?

An MTBF comes earlier. It not dropping at three without hiding the spare do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Reliability engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Data, MTBF and the Pareto.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Failure, the cause and not patching twice.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Spare, the critical and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
RCM, the plan and the one that is not done.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, the rush and not running the tired one.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not drop at three, and not hiding the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • MTBF
  • Pareto
  • root causes
  • critical spares
  • RCM
  • failures
  • maintenance plans
  • not patch twice

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

CAD designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimensions and the drawing.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Clash, the hit and not leaving it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
List, the material and the one that does not exist.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Change, the revision and not losing the native.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The shop, the doubt and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be made, and not leaving the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • 3D models
  • dimensions
  • clashes
  • bills of materials
  • revisions
  • shop drawings
  • natives
  • hits

Sources for this job· O*NET 17-3013.00· ESCO/ISCO 3118

Analyse my job

Jobs with similar scores

  1. 173Cost engineer27%
  2. 174Energy engineer27%
  3. 175Packaging engineer27%
  4. 177Materials engineer27%
  5. 178Renewables engineer27%
  6. 179Traffic engineer27%