How much of a Reliability engineer’s job can AI already do?
An MTBF comes earlier. It not dropping at three without hiding the spare do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Reliability engineer
27%
AI can already do 27% of this job.
#175 / 733
View rankingReliability engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Data, MTBF and the Pareto.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Failure, the cause and not patching twice.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Spare, the critical and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
RCM, the plan and the one that is not done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Production, the rush and not running the tired one.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not drop at three, and not hiding the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- MTBF
- Pareto
- root causes
- critical spares
- RCM
- failures
- maintenance plans
- not patch twice
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Commissioning engineer
22%
#387 / 733
View rankingCommissioning engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocol, the loop and the punch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, start-up and the one that is not ready.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Test, the trip and not jumping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Vendors, the one who does not come and the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the deadline and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Start up, and not leaving the interlock jumped.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test protocols
- loops
- punch list
- start-up
- trips
- vendors
- interlocks
- not sign half done
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149