How much of a Renewables engineer’s job can AI already do?

A solar resource and a layout come earlier. Connecting the plant so it actually exports do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Renewables engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Resource, layout and the yield model.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Site, topography and the cable that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Permits, grid point and the TSO.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
EPC, commissioning and export tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the council and the appeal against the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it exports, and not inflating equivalent hours.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plant layout
  • solar resource
  • grid connection
  • commissioning
  • renewables permits
  • yield model
  • export tests
  • EPC

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Astronomer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Proposal, time and the instrument.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Observe, calibrate and the one that clouds over.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Reduce, the pipeline and the artefact.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Paper, the referee and not jumping.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The facility, the queue and not losing the night.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Reduce, and not selling the find early.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • telescope time
  • calibrate
  • pipelines
  • papers
  • artefacts
  • nights
  • proposals
  • instruments

Sources for this job· O*NET 19-2011.00· ESCO/ISCO 2111

Analyse my job

Jobs with similar scores

  1. 160Energy engineer27%
  2. 161Packaging engineer27%
  3. 162Materials engineer27%
  4. 164Hydraulic engineer27%
  5. 165Textile engineer27%
  6. 166Key account manager27%