Automation index
How much of a Renewables engineer’s job can AI already do?
A solar resource and a layout come earlier. Connecting the plant so it actually exports do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Renewables engineer
27%
AI can already do 27% of this job.
#163 / 623
View rankingRenewables engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Resource, layout and the yield model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Site, topography and the cable that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Permits, grid point and the TSO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
EPC, commissioning and export tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the council and the appeal against the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it exports, and not inflating equivalent hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plant layout
- solar resource
- grid connection
- commissioning
- renewables permits
- yield model
- export tests
- EPC
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
Boilermaker
25%
#216 / 623
View rankingBoilermaker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, parts lists and material lists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Mark out, cut, roll and assemble plate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Weld, fit and erect in shop or on site.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Leak, pressure and finishing tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Repair boilers, tanks and ducts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Thickness, codes and liability for the weld.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- mark out plate
- weld boilers
- roll plate
- assemble tanks
- pressure tests
- erect on site
- read boilermaker drawings
- repair ducts
Sources for this job· O*NET 47-2011.00· ESCO/ISCO 7213