IS WORK OVER?

Automation index

How much of a Renewables engineer’s job can AI already do?

A solar resource and a layout come earlier. Connecting the plant so it actually exports do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Renewables engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Resource, layout and the yield model.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Site, topography and the cable that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Permits, grid point and the TSO.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
EPC, commissioning and export tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the council and the appeal against the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it exports, and not inflating equivalent hours.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plant layout
  • solar resource
  • grid connection
  • commissioning
  • renewables permits
  • yield model
  • export tests
  • EPC

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Coast guard

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Shout, the position and the boat.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Sea, the one who is drowning and the storm.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Inspection, the trawler and the one that runs.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Night, the radar and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The station, the note and not dressing the shortfall.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get the one who is drowning, and not losing the boat.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boats
  • shouts
  • drowning
  • trawlers
  • radar
  • the storm
  • inspections at sea
  • station notes

Sources for this job· O*NET 33-3051.00· ESCO/ISCO 5411

Analyse my job

Jobs with similar scores

  1. 172Energy engineer27%
  2. 173Packaging engineer27%
  3. 174Materials engineer27%
  4. 176Hydraulic engineer27%
  5. 177Textile engineer27%
  6. 178Immunologist27%