Automation index
How much of a Renewables engineer’s job can AI already do?
A solar resource and a layout come earlier. Connecting the plant so it actually exports do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Renewables engineer
27%
AI can already do 27% of this job.
#175 / 723
View rankingRenewables engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Resource, layout and the yield model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Site, topography and the cable that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Permits, grid point and the TSO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
EPC, commissioning and export tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the council and the appeal against the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it exports, and not inflating equivalent hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plant layout
- solar resource
- grid connection
- commissioning
- renewables permits
- yield model
- export tests
- EPC
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
Data protection inspector
27%
#180 / 723
View rankingData protection inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Notice, the file and the deadline.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Inspection, the processing and what is not there.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Breach, the notice and not delaying.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Fine, the test and not hunting the sole trader extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The director, the note and not leaking the file.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Walk into the file, and not leaving the data lying around.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- files
- processing
- breaches
- notices
- data fines
- AEPD deadlines
- sole traders
- not leak files
Sources for this job· O*NET 13-1041.00· ESCO/ISCO 2422