IS WORK OVER?

Automation index

How much of a Renewables engineer’s job can AI already do?

A solar resource and a layout come earlier. Connecting the plant so it actually exports do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Renewables engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Resource, layout and the yield model.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Site, topography and the cable that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Permits, grid point and the TSO.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
EPC, commissioning and export tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the council and the appeal against the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it exports, and not inflating equivalent hours.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plant layout
  • solar resource
  • grid connection
  • commissioning
  • renewables permits
  • yield model
  • export tests
  • EPC

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

District heating engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Balance, flows and the loss.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Chamber, the leak and the one that weeps.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Substation, the valve and the one that will not open.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Winter, the last block and not leaving it cold.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The council, the tariff and not hiding the loss.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the heat arrives, and not hiding the loss.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • heat balances
  • flows
  • network losses
  • chambers
  • heat substations
  • the last block
  • tariffs
  • leaks

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 177Reliability engineer27%
  2. 178Lighting engineer27%
  3. 179Materials engineer27%
  4. 181Requirements engineer27%
  5. 182Traffic engineer27%
  6. 183Hydraulic engineer27%