IS WORK OVER?

Automation index

How much of a Renewables engineer’s job can AI already do?

A solar resource and a layout come earlier. Connecting the plant so it actually exports do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Renewables engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Resource, layout and the yield model.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Site, topography and the cable that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Permits, grid point and the TSO.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
EPC, commissioning and export tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the council and the appeal against the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it exports, and not inflating equivalent hours.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plant layout
  • solar resource
  • grid connection
  • commissioning
  • renewables permits
  • yield model
  • export tests
  • EPC

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Dosimetrist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
CT, contours and the plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Organ at risk, the curve and not overshooting.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Physics, the check and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fraction, the setup and the patient who is not the same.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The oncologist, the trade-off and not signing blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The tumour gets it, and the healthy organ does not.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dose plans
  • contours
  • organs at risk
  • dosimetry check
  • fractions
  • setup
  • sim CT
  • DVH curves

Sources for this job· O*NET 29-2036.00· ESCO/ISCO 3211

Analyse my job

Jobs with similar scores

  1. 162Energy engineer27%
  2. 163Packaging engineer27%
  3. 164Materials engineer27%
  4. 166Hydraulic engineer27%
  5. 167Textile engineer27%
  6. 168Immunologist27%