IS WORK OVER?

Automation index

How much of a Renewables engineer’s job can AI already do?

A solar resource and a layout come earlier. Connecting the plant so it actually exports do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Renewables engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Resource, layout and the yield model.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Site, topography and the cable that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Permits, grid point and the TSO.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
EPC, commissioning and export tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the council and the appeal against the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it exports, and not inflating equivalent hours.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plant layout
  • solar resource
  • grid connection
  • commissioning
  • renewables permits
  • yield model
  • export tests
  • EPC

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Embryologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Retrieval, oocytes and the culture.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
ICSI, the sperm and the one that will not fertilise.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Time-lapse, the grade and picking.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Transfer, the catheter and not losing the embryo.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The file, the double check and not mixing couples.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Pick it, and not mixing the file.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • oocytes
  • ICSI
  • embryo culture
  • time-lapse
  • transfer
  • double check
  • egg retrieval
  • embryo grade

Sources for this job· O*NET 29-2011.00· ESCO/ISCO 2131

Analyse my job

Jobs with similar scores

  1. 162Energy engineer27%
  2. 163Packaging engineer27%
  3. 164Materials engineer27%
  4. 166Hydraulic engineer27%
  5. 167Textile engineer27%
  6. 168Immunologist27%