Automation index
How much of a Renewables engineer’s job can AI already do?
A solar resource and a layout come earlier. Connecting the plant so it actually exports do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Renewables engineer
27%
AI can already do 27% of this job.
#163 / 623
View rankingRenewables engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Resource, layout and the yield model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Site, topography and the cable that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Permits, grid point and the TSO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
EPC, commissioning and export tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the council and the appeal against the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it exports, and not inflating equivalent hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plant layout
- solar resource
- grid connection
- commissioning
- renewables permits
- yield model
- export tests
- EPC
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
Forklift operator
17%
#577 / 623
View rankingForklift operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Notes, locations and picking routes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive, lift and stack.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Loads, centres of gravity and aisles.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Shift, radio and dock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Logs, incidents and counts.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not hitting anyone or a pallet.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Notes, locations and picking routes
- Drive, lift and stack
- Loads, centres of gravity and aisles
- Shift, radio and dock
- Logs, incidents and counts
- Not hitting anyone or a pallet
- carretillero
- carretilla
- forklift
Sources for this job· O*NET 53-7051.00· ESCO/ISCO 8344