Automation index
How much of a Renewables engineer’s job can AI already do?
A solar resource and a layout come earlier. Connecting the plant so it actually exports do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Renewables engineer
27%
AI can already do 27% of this job.
#186 / 763
View rankingRenewables engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Resource, layout and the yield model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Site, topography and the cable that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Permits, grid point and the TSO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
EPC, commissioning and export tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the council and the appeal against the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it exports, and not inflating equivalent hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plant layout
- solar resource
- grid connection
- commissioning
- renewables permits
- yield model
- export tests
- EPC
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
Game developer
27%
#153 / 763
View rankingGame developer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Prototype, the loop and the input.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Physics, the bug and the one that teleports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Build, the platform and the one that will not ship.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Frame, 30 and not leaving it at 8.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The designer, the fun and not cutting what it feels.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it plays, and not leaving the frame at 8.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- game prototypes
- game loop
- input
- builds
- frames
- physics bugs
- platforms
- write game code
Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514