Automation index
How much of a Renewables engineer’s job can AI already do?
A solar resource and a layout come earlier. Connecting the plant so it actually exports do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Renewables engineer
27%
AI can already do 27% of this job.
#175 / 713
View rankingRenewables engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Resource, layout and the yield model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Site, topography and the cable that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Permits, grid point and the TSO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
EPC, commissioning and export tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the council and the appeal against the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it exports, and not inflating equivalent hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plant layout
- solar resource
- grid connection
- commissioning
- renewables permits
- yield model
- export tests
- EPC
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
Non-commissioned officer
22%
#435 / 713
View rankingNon-commissioned officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Drill, the trade and the sheet.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Barracks, the one who is late and the one who skives.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Guard, the weapon and not sleeping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Field, the mistake and not humiliating in public.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The officer, the order and not leaving the troops hanging.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they know the trade, and not humiliating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drill
- barracks
- guards
- weapons
- sheets
- the troops
- not humiliate
- the military trade
Sources for this job· O*NET 55-1017.00· ESCO/ISCO 0110