IS WORK OVER?

Automation index

How much of a Renewables engineer’s job can AI already do?

A solar resource and a layout come earlier. Connecting the plant so it actually exports do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Renewables engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Resource, layout and the yield model.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Site, topography and the cable that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Permits, grid point and the TSO.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
EPC, commissioning and export tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the council and the appeal against the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it exports, and not inflating equivalent hours.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plant layout
  • solar resource
  • grid connection
  • commissioning
  • renewables permits
  • yield model
  • export tests
  • EPC

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Pesticide applicator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Log, product and the dose.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Apply, drift and the wind that gets up.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
The withholding period and the one who wants in now.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
PPE, the container and the collection point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The neighbour, the bees and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not taking the river, and signing the treatment.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm log
  • pesticide dose
  • drift
  • withholding period
  • PPE
  • empty containers
  • bees
  • field wind

Sources for this job· O*NET 37-3012.00· ESCO/ISCO 6113

Analyse my job

Jobs with similar scores

  1. 160Energy engineer27%
  2. 161Packaging engineer27%
  3. 162Materials engineer27%
  4. 164Hydraulic engineer27%
  5. 165Textile engineer27%
  6. 166Key account manager27%