IS WORK OVER?

Automation index

How much of a Renewables engineer’s job can AI already do?

A solar resource and a layout come earlier. Connecting the plant so it actually exports do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Renewables engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Resource, layout and the yield model.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Site, topography and the cable that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Permits, grid point and the TSO.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
EPC, commissioning and export tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the council and the appeal against the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it exports, and not inflating equivalent hours.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plant layout
  • solar resource
  • grid connection
  • commissioning
  • renewables permits
  • yield model
  • export tests
  • EPC

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 174Packaging engineer27%
  2. 175Reliability engineer27%
  3. 176Materials engineer27%
  4. 178Traffic engineer27%
  5. 179Hydraulic engineer27%
  6. 180Textile engineer27%