IS WORK OVER?

Automation index

How much of a Renewables engineer’s job can AI already do?

A solar resource and a layout come earlier. Connecting the plant so it actually exports do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Renewables engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Resource, layout and the yield model.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Site, topography and the cable that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Permits, grid point and the TSO.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
EPC, commissioning and export tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the council and the appeal against the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it exports, and not inflating equivalent hours.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plant layout
  • solar resource
  • grid connection
  • commissioning
  • renewables permits
  • yield model
  • export tests
  • EPC

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Secondary teacher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Unit, criteria and the exam.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Classroom, the group and the one who blows it up.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Cover, the corridor and the fight.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Family, the report and not giving a 5 for quiet.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Staff, inspection and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they work, and nobody left out.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • unit plans
  • assessment criteria
  • secondary cover
  • corridors
  • the report
  • staff meeting
  • schools inspection
  • behaviour

Sources for this job· O*NET 25-2031.00· ESCO/ISCO 2330

Analyse my job

Jobs with similar scores

  1. 164Energy engineer27%
  2. 165Packaging engineer27%
  3. 166Materials engineer27%
  4. 168Hydraulic engineer27%
  5. 169Textile engineer27%
  6. 170Immunologist27%