IS WORK OVER?

Automation index

How much of a Renewables engineer’s job can AI already do?

A solar resource and a layout come earlier. Connecting the plant so it actually exports do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Renewables engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Resource, layout and the yield model.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Site, topography and the cable that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Permits, grid point and the TSO.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
EPC, commissioning and export tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the council and the appeal against the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it exports, and not inflating equivalent hours.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plant layout
  • solar resource
  • grid connection
  • commissioning
  • renewables permits
  • yield model
  • export tests
  • EPC

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Shipbuilder

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Block, alignment and the yard.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bead, NDT and the one that failed.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Launch, the weight and not jumping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Sea trial, the vibration and the one that knocks.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The owner, the rush and not leaving the bead half done.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it floats true, and not leaving the bead.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • yard blocks
  • alignment
  • ship beads
  • launch
  • sea trials
  • marine NDT
  • owners
  • vibrations

Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144

Analyse my job

Jobs with similar scores

  1. 177Reliability engineer27%
  2. 178Lighting engineer27%
  3. 179Materials engineer27%
  4. 181Requirements engineer27%
  5. 182Traffic engineer27%
  6. 183Hydraulic engineer27%