IS WORK OVER?

Automation index

How much of a Renewables engineer’s job can AI already do?

A solar resource and a layout come earlier. Connecting the plant so it actually exports do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Renewables engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Resource, layout and the yield model.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Site, topography and the cable that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Permits, grid point and the TSO.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
EPC, commissioning and export tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the council and the appeal against the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it exports, and not inflating equivalent hours.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plant layout
  • solar resource
  • grid connection
  • commissioning
  • renewables permits
  • yield model
  • export tests
  • EPC

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Sonographer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Protocols, IDs and worklists.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Scan, measure and capture slices.
Estimate

No public source provides a precise figure. This is our estimate.

22%12%+2.6
Calm, explain and not jump a diagnosis.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Brief the radiologist and archive the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Probes, gel and kit maintenance.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Pregnancy, bad news and shoulder ergonomics.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Protocols, IDs and worklists
  • Scan, measure and capture slices
  • Calm, explain and not jump a diagnosis
  • Probes, gel and kit maintenance
  • tecnico en ecografia
  • ecografista
  • sonographer

Sources for this job· O*NET 29-2032.00· ESCO/ISCO 3211

Analyse my job

Jobs with similar scores

  1. 160Energy engineer27%
  2. 161Packaging engineer27%
  3. 162Materials engineer27%
  4. 164Hydraulic engineer27%
  5. 165Textile engineer27%
  6. 166Key account manager27%