IS WORK OVER?

Automation index

How much of a Renewables engineer’s job can AI already do?

A solar resource and a layout come earlier. Connecting the plant so it actually exports do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Renewables engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Resource, layout and the yield model.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Site, topography and the cable that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Permits, grid point and the TSO.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
EPC, commissioning and export tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the council and the appeal against the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it exports, and not inflating equivalent hours.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plant layout
  • solar resource
  • grid connection
  • commissioning
  • renewables permits
  • yield model
  • export tests
  • EPC

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Sports physiotherapist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Injury, the test and the note.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Pitch, the move and the one who lies about pain.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Gym, the load and not rushing.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Sunday, the coach and not yielding.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The press, the rumour and not leaking.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If they play Sunday, sign it. And not burning them.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • return to play
  • injury notes
  • gym load
  • sport-specific move
  • Sunday clearance
  • the coach
  • not yield
  • not leak

Sources for this job· O*NET 29-1123.00· ESCO/ISCO 2264

Analyse my job

Jobs with similar scores

  1. 163Energy engineer27%
  2. 164Packaging engineer27%
  3. 165Materials engineer27%
  4. 167Hydraulic engineer27%
  5. 168Textile engineer27%
  6. 169Immunologist27%