IS WORK OVER?

Automation index

How much of a Renewables engineer’s job can AI already do?

A solar resource and a layout come earlier. Connecting the plant so it actually exports do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Renewables engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Resource, layout and the yield model.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Site, topography and the cable that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Permits, grid point and the TSO.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
EPC, commissioning and export tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the council and the appeal against the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it exports, and not inflating equivalent hours.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plant layout
  • solar resource
  • grid connection
  • commissioning
  • renewables permits
  • yield model
  • export tests
  • EPC

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Tiler

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Layout, levels and ordering tile.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Cut, set and grout.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Substrates, falls and awkward points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, client and not staining the house.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quantities, extras and logs.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a floor that sounds hollow.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Layout, levels and ordering tile
  • Cut, set and grout
  • Substrates, falls and awkward points
  • Site, client and not staining the house
  • Quantities, extras and logs
  • Not leaving a floor that sounds hollow
  • solador

Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7122

Analyse my job

Jobs with similar scores

  1. 160Energy engineer27%
  2. 161Packaging engineer27%
  3. 162Materials engineer27%
  4. 164Hydraulic engineer27%
  5. 165Textile engineer27%
  6. 166Key account manager27%