Automation index
How much of a Residential porter’s job can AI already do?
A fault sheet comes earlier. Being there when it floods without losing the master key do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Residential porter
19%
AI can already do 19% of this job.
#630 / 743
View rankingResidential porter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Shift, the sheet and the letterboxes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hall, the neighbour and the one who is not.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Fault, the water and calling it in.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Move, the lift and not scratching.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The residents, the complaint and not taking sides.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Be there when it floods, and not losing the master.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fault sheets
- master key
- the hall
- letterboxes
- floods
- moves
- the residents
- not take sides
Sources for this job· O*NET 39-6012.00· ESCO/ISCO 9629
IS WORK OVER?
Bridge engineer
22%
#391 / 743
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142