Automation index
How much of a Residential porter’s job can AI already do?
A fault sheet comes earlier. Being there when it floods without losing the master key do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Residential porter
19%
AI can already do 19% of this job.
#638 / 753
View rankingResidential porter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Shift, the sheet and the letterboxes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hall, the neighbour and the one who is not.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Fault, the water and calling it in.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Move, the lift and not scratching.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The residents, the complaint and not taking sides.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Be there when it floods, and not losing the master.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fault sheets
- master key
- the hall
- letterboxes
- floods
- moves
- the residents
- not take sides
Sources for this job· O*NET 39-6012.00· ESCO/ISCO 9629
IS WORK OVER?
Control engineer
22%
#389 / 753
View rankingControl engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
PID, tune and the model.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the swing and the one that runs away.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Mode, manual and not leaving it for ever.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Alarm, the interlock and not silencing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Operations, the recipe and not changing blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not swing, and not leaving manual for ever.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- PID
- tune
- swings
- manual mode
- interlocks
- recipes
- control models
- not silence alarms
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149