Automation index
How much of a Residential porter’s job can AI already do?
A fault sheet comes earlier. Being there when it floods without losing the master key do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Residential porter
19%
AI can already do 19% of this job.
#638 / 753
View rankingResidential porter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Shift, the sheet and the letterboxes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hall, the neighbour and the one who is not.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Fault, the water and calling it in.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Move, the lift and not scratching.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The residents, the complaint and not taking sides.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Be there when it floods, and not losing the master.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fault sheets
- master key
- the hall
- letterboxes
- floods
- moves
- the residents
- not take sides
Sources for this job· O*NET 39-6012.00· ESCO/ISCO 9629
IS WORK OVER?
PLC programmer
22%
#453 / 753
View rankingPLC programmer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Ladder, tags and the comment.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Cell, the fault and the one that will not stop.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
E-stop, the cable and not jumping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Recipe, the change and not dumping production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The electrician, the terminals and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it stops on a fault, and not jumping the e-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program PLCs
- tags
- e-stops
- faults
- recipes
- terminals
- program comments
- not jump e-stops
Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514