Automation index
How much of a Residential youth worker’s job can AI already do?
An incident sheet comes earlier. Being there at the spike without them getting hurt do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Residential youth worker
19%
AI can already do 19% of this job.
#586 / 743
View rankingResidential youth worker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Shift, the sheet and the group.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Spike, the hold and not humiliating.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Night, the abscond and calling it in.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Court, the report and not dressing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The family, the visit and not taking sides.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Be there at the spike, and that they do not get hurt.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- incident sheets
- holds
- absconds
- court reports
- residential shifts
- family visits
- not humiliate
- the group
Sources for this job· O*NET 21-1093.00· ESCO/ISCO 2635
IS WORK OVER?
Control engineer
22%
#386 / 743
View rankingControl engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
PID, tune and the model.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the swing and the one that runs away.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Mode, manual and not leaving it for ever.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Alarm, the interlock and not silencing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Operations, the recipe and not changing blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not swing, and not leaving manual for ever.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- PID
- tune
- swings
- manual mode
- interlocks
- recipes
- control models
- not silence alarms
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149