IS WORK OVER?

Automation index

How much of a Restaurant maître’s job can AI already do?

A floor plan and a booking come earlier. A Saturday room that actually breathes does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Restaurant maître

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bookings, floor plan and briefing.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Greet, seat and read the room.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Floor team, passes and complaints.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Menu, wine and suggestions.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Close, till and reviews.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not sinking a service or a waiter.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Bookings, floor plan and briefing
  • Greet, seat and read the room
  • Floor team, passes and complaints
  • Menu, wine and suggestions
  • Close, till and reviews
  • Not sinking a service or a waiter
  • jefe de sala
  • maitre

Sources for this job· O*NET 35-1012.00· ESCO/ISCO 1412

CAD designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimensions and the drawing.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Clash, the hit and not leaving it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
List, the material and the one that does not exist.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Change, the revision and not losing the native.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The shop, the doubt and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be made, and not leaving the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • 3D models
  • dimensions
  • clashes
  • bills of materials
  • revisions
  • shop drawings
  • natives
  • hits

Sources for this job· O*NET 17-3013.00· ESCO/ISCO 3118

Analyse my job

Jobs with similar scores

  1. 608Window installer19%
  2. 609Diving instructor19%
  3. 610Climbing instructor19%
  4. 612Judge19%
  5. 613Speech therapist19%
  6. 614Luthier19%