IS WORK OVER?

Automation index

How much of a Restaurant maître’s job can AI already do?

A floor plan and a booking come earlier. A Saturday room that actually breathes does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Restaurant maître

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bookings, floor plan and briefing.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Greet, seat and read the room.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Floor team, passes and complaints.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Menu, wine and suggestions.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Close, till and reviews.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not sinking a service or a waiter.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Bookings, floor plan and briefing
  • Greet, seat and read the room
  • Floor team, passes and complaints
  • Menu, wine and suggestions
  • Close, till and reviews
  • Not sinking a service or a waiter
  • jefe de sala
  • maitre

Sources for this job· O*NET 35-1012.00· ESCO/ISCO 1412

Telecom engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Size, simulate and plan radio and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Projects, permits and sites.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Field, measurements and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incidents, NOC and operators.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, spectrum and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a town dark from a mistake.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Size, simulate and plan radio and fibre
  • Projects, permits and sites
  • Field, measurements and commissioning
  • Incidents, NOC and operators
  • Rules, spectrum and documentation
  • Not leaving a town dark from a mistake
  • ingeniero de telecomunicaciones
  • telecom engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153

Analyse my job

Jobs with similar scores

  1. 502Window installer19%
  2. 503Diving instructor19%
  3. 504Climbing instructor19%
  4. 506Judge19%
  5. 507Speech therapist19%
  6. 508Luthier19%