Automation index
How much of a Rheumatologist’s job can AI already do?
A serology and a DAS28 come earlier. Starting the biologic and not leaving the patient stiff do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Rheumatologist
23%
AI can already do 23% of this job.
#312 / 633
View rankingRheumatologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read serologies, rheumatoid factor and imaging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Examine joints and call the flare.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Biologics, steroids and methotrexate.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Inject, educate and watch side effects.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
A long clinic, pain you cannot see, and the wait.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Board, pharmacy and owning the immunosuppressant.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- treat arthritis
- prescribe biologics
- examine joints
- inject joints
- read serologies
- DAS28
- rheumatology clinic
- methotrexate
Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212
IS WORK OVER?
Civil engineer
25%
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142