Automation index
How much of a Rheumatologist’s job can AI already do?
A serology and a DAS28 come earlier. Starting the biologic and not leaving the patient stiff do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Rheumatologist
23%
AI can already do 23% of this job.
#312 / 633
View rankingRheumatologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read serologies, rheumatoid factor and imaging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Examine joints and call the flare.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Biologics, steroids and methotrexate.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Inject, educate and watch side effects.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
A long clinic, pain you cannot see, and the wait.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Board, pharmacy and owning the immunosuppressant.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- treat arthritis
- prescribe biologics
- examine joints
- inject joints
- read serologies
- DAS28
- rheumatology clinic
- methotrexate
Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212
IS WORK OVER?
Industrial engineer
28%
#102 / 633
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141