Automation index
How much of a Rheumatologist’s job can AI already do?
A serology and a DAS28 come earlier. Starting the biologic and not leaving the patient stiff do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Rheumatologist
23%
AI can already do 23% of this job.
#312 / 633
View rankingRheumatologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read serologies, rheumatoid factor and imaging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Examine joints and call the flare.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Biologics, steroids and methotrexate.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Inject, educate and watch side effects.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
A long clinic, pain you cannot see, and the wait.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Board, pharmacy and owning the immunosuppressant.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- treat arthritis
- prescribe biologics
- examine joints
- inject joints
- read serologies
- DAS28
- rheumatology clinic
- methotrexate
Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212
IS WORK OVER?
Production engineer
25%
#233 / 633
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141