Automation index
How much of a Rheumatologist’s job can AI already do?
A serology and a DAS28 come earlier. Starting the biologic and not leaving the patient stiff do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Rheumatologist
23%
AI can already do 23% of this job.
#348 / 743
View rankingRheumatologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read serologies, rheumatoid factor and imaging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Examine joints and call the flare.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Biologics, steroids and methotrexate.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Inject, educate and watch side effects.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
A long clinic, pain you cannot see, and the wait.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Board, pharmacy and owning the immunosuppressant.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- treat arthritis
- prescribe biologics
- examine joints
- inject joints
- read serologies
- DAS28
- rheumatology clinic
- methotrexate
Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142