IS WORK OVER?

Automation index

How much of a Risk manager’s job can AI already do?

A risk map and a VaR come earlier. Stopping a product and convincing the committee do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Risk manager

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Maps, models and risk reporting.
Estimate

No public source provides a precise figure. This is our estimate.

22%52%+11.4
Policies, limits and stress tests.
Estimate

No public source provides a precise figure. This is our estimate.

18%45%+8.1
Escalate an incident and talk to desks.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Committee, exceptions and negotiation.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Data quality and model assumptions.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Stop the risk and sign the opinion.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%29%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Maps, models and risk reporting
  • Policies, limits and stress tests
  • Escalate an incident and talk to desks
  • Committee, exceptions and negotiation
  • Data quality and model assumptions
  • Stop the risk and sign the opinion
  • risk manager
  • gestor de riesgos
  • riesgo operacional

Sources for this job· O*NET 13-2099.02· ESCO/ISCO 2413

Aerospace technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bench, the protocol and the torque.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Part, the lockwire and the one left loose.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
NDT, the crack and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Engine, the run and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The engineer, the rush and not signing half done.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Torque it, and not leaving the lockwire loose.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • test bench
  • torque
  • lockwire
  • aerospace NDT
  • engine runs
  • protocols
  • cracks
  • not sign half done

Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115

Analyse my job

Jobs with similar scores

  1. 57Criminologist29%
  2. 58Data protection officer29%
  3. 59Geographer29%
  4. 61Court case manager29%
  5. 62Labour consultant29%
  6. 63Quality engineer29%