IS WORK OVER?

Automation index

How much of a Risk manager’s job can AI already do?

A risk map and a VaR come earlier. Stopping a product and convincing the committee do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Risk manager

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Maps, models and risk reporting.
Estimate

No public source provides a precise figure. This is our estimate.

22%52%+11.4
Policies, limits and stress tests.
Estimate

No public source provides a precise figure. This is our estimate.

18%45%+8.1
Escalate an incident and talk to desks.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Committee, exceptions and negotiation.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Data quality and model assumptions.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Stop the risk and sign the opinion.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%29%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Maps, models and risk reporting
  • Policies, limits and stress tests
  • Escalate an incident and talk to desks
  • Committee, exceptions and negotiation
  • Data quality and model assumptions
  • Stop the risk and sign the opinion
  • risk manager
  • gestor de riesgos
  • riesgo operacional

Sources for this job· O*NET 13-2099.02· ESCO/ISCO 2413

Airport ramp agent

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Load plan, LIR and hold allocation.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Load, unload, pushback and ramp assistance.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Bags, ULDs and special cargo.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordinate with crew, ops and fuel.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Times, delays and ramp safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Trim, papers and liability for the load.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • load aircraft
  • do pushback
  • allocate holds
  • move bags
  • load planning
  • ramp assistance
  • handle ULDs
  • ramp safety

Sources for this job· O*NET 53-6051.00· ESCO/ISCO 9333

Analyse my job

Jobs with similar scores

  1. 57Criminologist29%
  2. 58Data protection officer29%
  3. 59Geographer29%
  4. 61Court case manager29%
  5. 62Labour consultant29%
  6. 63Quality engineer29%