Automation index
How much of a Risk manager’s job can AI already do?
A risk map and a VaR come earlier. Stopping a product and convincing the committee do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Risk manager
29%
AI can already do 29% of this job.
#60 / 753
View rankingRisk manager
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Maps, models and risk reporting.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 52% | +11.4 |
Policies, limits and stress tests.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 45% | +8.1 |
Escalate an incident and talk to desks.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Committee, exceptions and negotiation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Data quality and model assumptions.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Stop the risk and sign the opinion.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 29% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Maps, models and risk reporting
- Policies, limits and stress tests
- Escalate an incident and talk to desks
- Committee, exceptions and negotiation
- Data quality and model assumptions
- Stop the risk and sign the opinion
- risk manager
- gestor de riesgos
- riesgo operacional
Sources for this job· O*NET 13-2099.02· ESCO/ISCO 2413
IS WORK OVER?
HVAC engineer
27%
#173 / 753
View rankingHVAC engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Loads, flows and the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Works, the duct and the one they crushed.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Commissioning, the balance and the room that sweats.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Noise, the grille and not leaving the whistle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the saving and not killing the fresh air.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not sweat, and not oversizing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- load calcs
- air flows
- ducts
- balancing
- grilles
- fresh air
- whistles
- HVAC plant
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149