IS WORK OVER?

Automation index

How much of a Robotics engineer’s job can AI already do?

A path and a twin come earlier. Putting the robot on the line without taking anyone with it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Robotics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paths, PLC and the cell twin.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Cell, grippers and the cycle that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Safety, fencing and CE validation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, backups and the overwritten program.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, takt and the robot that stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it takes nobody with it, and signing the cell.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program robots
  • paths
  • robot cells
  • safety fencing
  • cell PLC
  • CE validation
  • grippers
  • takt

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Adult literacy tutor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Level, the sheet and the one who did not come.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Reading, the contract and the small print.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Writing, the form and not doing it for them.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Group, the shame and not exposing them.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The council, the grant and not inflating attendance.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they read the contract, and not being ashamed.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • syllables
  • reading contracts
  • forms
  • literacy groups
  • shame
  • small print
  • attendance
  • not expose

Sources for this job· O*NET 25-3011.00· ESCO/ISCO 2359

Analyse my job

Jobs with similar scores

  1. 247Civil engineer25%
  2. 248Petroleum engineer25%
  3. 249Production engineer25%
  4. 251Telecom engineer25%
  5. 252Electrical engineer25%
  6. 253Electronics engineer25%