IS WORK OVER?

Automation index

How much of a Robotics engineer’s job can AI already do?

A path and a twin come earlier. Putting the robot on the line without taking anyone with it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Robotics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paths, PLC and the cell twin.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Cell, grippers and the cycle that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Safety, fencing and CE validation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, backups and the overwritten program.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, takt and the robot that stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it takes nobody with it, and signing the cell.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program robots
  • paths
  • robot cells
  • safety fencing
  • cell PLC
  • CE validation
  • grippers
  • takt

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Animal breeder

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Lines, seasons and the mating.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Birth, litter and the one that will not feed.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Health, vaccines and the breed standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Home, the contract and the one that is not for that.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The fashion, the demand and not over-breeding.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
A healthy litter, and not placing with just anyone.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • breeding lines
  • seasons
  • litters
  • breed standard
  • placement contracts
  • litter vaccines
  • births
  • not over-breed

Sources for this job· O*NET 45-2021.00· ESCO/ISCO 6121

Analyse my job

Jobs with similar scores

  1. 231Civil engineer25%
  2. 232Petroleum engineer25%
  3. 233Production engineer25%
  4. 235Telecom engineer25%
  5. 236Electrical engineer25%
  6. 237Electronics engineer25%