Automation index
How much of a Robotics engineer’s job can AI already do?
A path and a twin come earlier. Putting the robot on the line without taking anyone with it do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Robotics engineer
25%
AI can already do 25% of this job.
#234 / 633
View rankingRobotics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Paths, PLC and the cell twin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Cell, grippers and the cycle that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Safety, fencing and CE validation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Maintenance, backups and the overwritten program.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Production, takt and the robot that stops.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it takes nobody with it, and signing the cell.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program robots
- paths
- robot cells
- safety fencing
- cell PLC
- CE validation
- grippers
- takt
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
Climbing instructor
19%
#504 / 633
View rankingClimbing instructor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Knots, harness and the briefing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Wall, the panic and the one who freezes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Belay, the factor and not getting distracted.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rock, anchors and the one that is loose.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The group, the ego and not going too high.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That they do not fall, and the knot tied.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- knots
- harness
- belay
- fall factor
- anchors
- the wall
- panic
- route briefing
Sources for this job· O*NET 39-9032.00· ESCO/ISCO 3422