Automation index
How much of a Robotics engineer’s job can AI already do?
A path and a twin come earlier. Putting the robot on the line without taking anyone with it do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Robotics engineer
25%
AI can already do 25% of this job.
#234 / 633
View rankingRobotics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Paths, PLC and the cell twin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Cell, grippers and the cycle that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Safety, fencing and CE validation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Maintenance, backups and the overwritten program.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Production, takt and the robot that stops.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it takes nobody with it, and signing the cell.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program robots
- paths
- robot cells
- safety fencing
- cell PLC
- CE validation
- grippers
- takt
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
Cloud architect
28%
#82 / 633
View rankingCloud architect
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagrams, ADRs and a first IaC pass.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Cost estimate, Well-Architected and gaps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Review PRs, security and network.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 20% | +3.2 |
Align with security, finops and product.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
PoCs, real failures and vendor limits.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sign the design and own the incident.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Diagrams, ADRs and a first IaC pass
- Cost estimate, Well-Architected and gaps
- Review PRs, security and network
- Align with security, finops and product
- PoCs, real failures and vendor limits
- Sign the design and own the incident
- arquitecto cloud
Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511