IS WORK OVER?

Automation index

How much of a Robotics engineer’s job can AI already do?

A path and a twin come earlier. Putting the robot on the line without taking anyone with it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Robotics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paths, PLC and the cell twin.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Cell, grippers and the cycle that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Safety, fencing and CE validation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, backups and the overwritten program.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, takt and the robot that stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it takes nobody with it, and signing the cell.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program robots
  • paths
  • robot cells
  • safety fencing
  • cell PLC
  • CE validation
  • grippers
  • takt

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Electoral officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Roll, additions and the one who is not there.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Station, the chair and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Polling day, the incident and the one who protests.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Count, the minute and not jumping a result.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The board, the complaint and not losing the box.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the right one votes, and not losing the box.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • electoral roll
  • stations
  • ballot boxes
  • the count
  • minutes
  • incidents
  • polling day
  • roll additions

Sources for this job· O*NET 13-1199.00· ESCO/ISCO 3359

Analyse my job

Jobs with similar scores

  1. 262Civil engineer25%
  2. 263Petroleum engineer25%
  3. 264Production engineer25%
  4. 266Telecom engineer25%
  5. 267Electrical engineer25%
  6. 268Electronics engineer25%