IS WORK OVER?

Automation index

How much of a Robotics engineer’s job can AI already do?

A path and a twin come earlier. Putting the robot on the line without taking anyone with it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Robotics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paths, PLC and the cell twin.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Cell, grippers and the cycle that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Safety, fencing and CE validation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, backups and the overwritten program.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, takt and the robot that stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it takes nobody with it, and signing the cell.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program robots
  • paths
  • robot cells
  • safety fencing
  • cell PLC
  • CE validation
  • grippers
  • takt

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Facilities engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
CMMS, tickets and the PPM.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Roof, the chiller and the one that will not start.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Generator, the diesel and not leaving it dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fire, the pump and the monthly test.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The tenant, August and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That cooling does not die, and not leaving the generator dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CMMS
  • PPM
  • chillers
  • generators
  • diesel
  • fire pumps
  • roofs
  • tickets

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 270Civil engineer25%
  2. 271Petroleum engineer25%
  3. 272Production engineer25%
  4. 274Telecom engineer25%
  5. 275Electrical engineer25%
  6. 276Electronics engineer25%