IS WORK OVER?

Automation index

How much of a Robotics engineer’s job can AI already do?

A path and a twin come earlier. Putting the robot on the line without taking anyone with it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Robotics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paths, PLC and the cell twin.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Cell, grippers and the cycle that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Safety, fencing and CE validation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, backups and the overwritten program.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, takt and the robot that stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it takes nobody with it, and signing the cell.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program robots
  • paths
  • robot cells
  • safety fencing
  • cell PLC
  • CE validation
  • grippers
  • takt

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Investment analyst

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, comps and the memo.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Data, the gap and what is not in the sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Committee, the thesis and the one who falls in love.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Follow-up, the profit warning and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The PM, the rush and not inflating the target.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Buy or not, and signing the memo.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • valuation models
  • comps
  • investment memos
  • thesis
  • profit warning
  • target
  • investment committee
  • follow-up

Sources for this job· O*NET 13-2051.00· ESCO/ISCO 2413

Analyse my job

Jobs with similar scores

  1. 231Civil engineer25%
  2. 232Petroleum engineer25%
  3. 233Production engineer25%
  4. 235Telecom engineer25%
  5. 236Electrical engineer25%
  6. 237Electronics engineer25%